 MM1 Hosford removing inlet header of 2
main machinery room auxiliary gland exhaust condenser in preparation for underway emergent
repairs. |
 FA Jensen and FA Soto removing inlet
valve on 2 main machinery room auxiliary gland exhaust condenser. |
 FA
Langteau cleaning inlet header of the clogged condenser. This condenser was cleaned and
back in service within 8 hours. |
 Michael
"JORDAN" Stockstill being re-enlisted by the Main Propulsion Assistant. |
 LTJG
Alaniz receiving his Engineering Officer of the Watch qualification letter from the Chief
Engineer. |
 MM3
Richardson and MM3 Johnson receiving Enlisted Surface Warfare Pins. |
 DC3
Walker ringing the bell over the ships announcing system to alert the engineering
department of a major lube oil leak. This was engineering departments completion of
drill 1000 in a one year period. |
 MM3
Schaneman instructing FN Scott how to control an electrical fire on a 2400 amp
ship-service-turbine generator. |

Chief Engineer presenting Auxiliary Division personnel with Warfare
Qualification pins. 31 engineers have completed this qualification during this deployment. |

EM2 Alfaro running emergency power cable for #7 fire and flushing pump. |

EMFN Phan making the final connections to #7 fire and flushing board. |
|